• Home
  • Metro Asian News
  • Misc Asia
  • Lifestyle
  • Business
  • Art
  • Health
  • Eat Out
  • Events
  • Podcasts
ABOUT
Advertise in GAT
Contact us
Monday, May 29, 2023
Georgia Asian Times
International Insurance of Georgia
  • Home
  • Metro Asian News
  • Misc Asia
  • Lifestyle
  • Business
  • Art
  • Health
  • Eat Out
  • Events
  • Podcasts
  • Login
No Result
View All Result
  • Home
  • Metro Asian News
  • Misc Asia
  • Lifestyle
  • Business
  • Art
  • Health
  • Eat Out
  • Events
  • Podcasts
No Result
View All Result
Georgia Asian Times
No Result
View All Result
  • Home
  • Metro Asian News
  • Misc Asia
  • Lifestyle
  • Business
  • Art
  • Health
  • Eat Out
  • Events
  • Podcasts
Home Nation

Engine problem leads NASA to scrub launch of new moon rocket

The leak of highly explosive hydrogen appeared in the same place that saw seepage during a dress rehearsal back in the spring.

Georgia Asian Times by Georgia Asian Times
August 29, 2022
in Nation
Engine problem leads NASA to scrub launch of new moon rocket
Share on FacebookShare on Twitter

Cape Canaveral, August 29, 2022 — A fuel leak and then an engine problem during final liftoff preparations led NASA to call off the launch of its mighty new moon rocket Monday on its debut flight with three test dummies aboard.

The next launch attempt will not take place until Friday at the earliest and could be off until next month.

The flight, when it happens, will be the first launch in NASA’s Artemis project, a quest to put astronauts back on the moon for the time since the Apollo program ended 50 years ago.

As precious minutes ticked away Monday morning, NASA repeatedly stopped and started the fueling of the Space Launch System rocket with nearly 1 million gallons of super-cold hydrogen and oxygen because of a leak of highly explosive hydrogen. The leak happened in the same place that saw seepage during a dress rehearsal back in the spring.

AD: High Museum of Atlanta AD: High Museum of Atlanta

Then, NASA ran into new trouble when it was unable to properly chill one of the rocket’s four main engines, officials said. Engineers continued working to pinpoint the source of the problem after the launch postponement was announced.

“This is a very complicated machine, a very complicated system, and all those things have to work, and you don’t want to light the candle until it’s ready to go,” said NASA Administrator Bill Nelson.

Referring to launch delays, Nelson said: “It’s just part of the space business and it’s part of, particularly, a test flight.”

The rocket was set to lift off on a flight to propel a crew capsule into orbit around the moon. The six-week mission was scheduled to end with the capsule returning to Earth in a splashdown in the Pacific in October.

The 322-foot (98-meter) spaceship is the most powerful rocket ever built by NASA, out-muscling even the Saturn V that the Apollo astronauts rode.

As for when NASA might make another liftoff attempt, launch commentator Derrol Nail said engineers were still analyzing the engine problem and “we must wait to see what shakes out from their test data.”

No astronauts were inside the rocket’s Orion capsule. Instead, the test dummies, fitted with sensors to measure vibration, cosmic radiation and other conditions, were strapped in for the shakedown flight, meant to stress-test the spacecraft and push it to its limits in ways that would never be attempted with humans aboard.

Even though no one was on board, thousands of people jammed the coast to see the rocket soar. Vice President Kamala Harris was among the VIPs who arrived for the event.

Assuming the shakedown flight goes well, astronauts will strap in for the second mission and fly around the moon and back as soon as 2024. A two-person lunar landing could follow by the end of 2025.

The problems seen Monday were reminiscent of NASA’s space shuttle era, when hydrogen fuel leaks disrupted countdowns and delayed a string of launches back in 1990.

Later in the morning, NASA also officials spotted what they feared was a crack or some other defect on the core stage — the big orange fuel tank with four main engines on it — but they later said it appeared to be just a buildup of frost in a crevice of the insulating foam.

Launch director Charlie Blackwell-Thompson and her team also had to deal with a communication problem involving the Orion capsule.

Engineers scrambled to understand an 11-minute delay in the communication lines between launch control and Orion that cropped up late Sunday. Though the problem had cleared by Monday morning, NASA needed to know why it happened before committing to a launch.

Regardless of all the technical snags, thunderstorms ultimately would have prevented a liftoff. Dark clouds gathered over the launch site as soon as Blackwell-Thompson halted the countdown, with thunder echoing across the coast. – AP

Tags: NASA
Previous Post

LG, Honda to set up US joint venture to make EV batteries

Next Post

EXCLUSIVE: Conversation with Dr. Jung Ha Kim, former CEO of CPACS

Georgia Asian Times

Georgia Asian Times

Related Posts

Nation

What’s next on the debt ceiling: Selling the plan and making a deal into a law

May 28, 2023
Nation

Biden, McCarthy to hold pivotal meeting on debt ceiling as time to resolve standoff grows short

May 22, 2023
Senate Democrats pass budget package, a victory for Biden
Nation

Biden scraps planned visit to Australia, Papua New Guinea to focus on debt limit talks

May 17, 2023
Migrants race to US border as Title 42 pandemic restrictions expire, straining US immigration system
Nation

Migrants race to US border as Title 42 pandemic restrictions expire, straining US immigration system

May 12, 2023
New study reveal diverse cultures and shares experiences formed unique Asian Americans identities
Nation

New study reveal diverse cultures and shares experiences formed unique Asian Americans identities

May 9, 2023
Texas mall victims include 3 members of the same Korean American family
Nation

Texas mall victims include 3 members of the same Korean American family

May 9, 2023
Next Post
2022 GAT 25 Most Influential Asian Americans in Georgia

EXCLUSIVE: Conversation with Dr. Jung Ha Kim, former CEO of CPACS

Signup Free E-Newsletter

Upcoming Events

Jul 14
6:00 pm - 10:30 pm

GAT 25 Most Influential Asian Americans in Georgia 2023

View Calendar
Logo

 

CONTACT US

Follow Us

MOST INFLUENTIAL

2023 GAT 25 Most Influential Asian American Pacific Islanders in Georgia

2023 GAT 25 Most Influential Asian American Pacific Islanders in Georgia

April 30, 2023
GAT 25 Most Influential Asian Americans Gala celebrates Asian voice

GAT 25 Most Influential Asian Americans Gala celebrates Asian voice

July 18, 2022

Video highlights of GAT 25 Most Influential Asian Americans in Georgia

July 17, 2022

LINKS OF INTEREST

ATL Asian Film Festival

     

GAT AAPI SUMMIT 2023

  • Contact Us
  • Advertise in GAT
  • About
  • Privacy Policy
  • Terms of Use

© 2023 Georgia Asian Times - Empowered by 8SOL. Managed by Arckopolis.

No Result
View All Result
  • Home
  • Metro Asian News
  • Misc Asia
  • Lifestyle
  • Business
  • Art
  • Health
  • Eat Out
  • Events
  • Podcasts

© 2023 Georgia Asian Times - Empowered by 8SOL. Managed by Arckopolis.

Welcome Back!

Sign In with Google
OR

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

Early Bird (May 19-31, 2023)

  • Honoree

    $225.00
    Select
  • Single Seat

    $225.00
    Select
  • Table of 8

    $1,800.00
    Select

Subscribe

Stay ahead of the curve with Georgia Asian Times’ exclusive newsletter. Get the hottest news stories and cultural insights delivered straight to your inbox. No subscription fees, just pure Asian excellence

 

    Loading
    Loading
    Loading
    Loading
    Loading
    Register for FREE to read the rest of this article, or log in to your account.

      Or Login Here :

      [loginfrm]

      Are you sure want to unlock this post?
      Unlock left : 0
      Are you sure want to cancel subscription?